All Posts

BTP PADANG'S EFFORTS TO MAINTAIN AND CARE FOR INACTIVE RAILWAY TRACKS

Padang – As the Mak Itam train has not resumed operations on the Sawahlunto Station - Muarokalaban Station route, this track has been temporarily inactive.

AFFORDABLE HOLIDAY FOR ONLY RP 3.000 WITH LEMBAH ANAI TRAIN

Padang – West Sumatra (Sumbar) is a destination with a unique charm for both domestic and international travelers, offering a blend of natural beauty, culture, history, and cuisine.

BTP PADANG RESPONDS TO REQUEST FOR OPENING LEVEL CROSSING IN KAYUTANAM

Padang — The Padang Class II Railway Technical Centre (BTP Padang) has responded to a request from the local community to open a level crossing at KM 58+220, between Stasiun Sicincin and Kayutanam. In the interest of improving s

TIMELY PERFORMANCE OF SUMBAR’S TRAINS REACHES 99%

Padang – The Padang Class II Railway Engineering Center (BTP) has conducted monitoring and evaluation of the 2023 Train Schedule (Gapeka) to assess the punctuality and performance of train operations in West Sumatra (Sumbar), fo

BTP PADANG IMPROVES DUKU AND PASAR USANG LEVEL CROSSINGS AHEAD OF EID TRAVELERS

Padang — Recently, the Balai Teknik Perkeretaapian (BTP) Kelas II Padang conducted repairs on two busy level crossings in Duku and Pasar Usang, Padang Pariaman Regency, to prepare for the influx of travelers heading in and out o