GOVERNMENT AGENCY PERFORMANCE REPORT 2016 OF RAIWAYS ENGINEERING OFFICE CENTRAL JAVA

This LKIP 2016 report is the implementation of the Performance Plan of the Class I Railways Engineering Office for the Central Java Region which has been determined through a Performance Agreement which is monitored and evaluated during the current period specified in the 2016 Performance Agreement Review document and is the first year of the Strategic Plan period. (Renstra) Year 2015 - 2019.

Hopefully this 2020 Class I Railways Engineering Office for Central Java Region Performance Report can be a reference and reference in an effort to improve the performance of Class I Railways Engineering Office Java Region in the future.

Documents can be downloaded at this link https://djka.dephub.go.id/uploads/202306/LAKIP_2016_BTP_JATENG.pdf