All Posts

THE HEAD OF THE CLASS II RAILWAY TECHNICAL OFFICE (BTP) IN PADANG : ALL RAILWAY TRACKS IN WEST SUMATRA ARE A PRIORITY

Padang — The Head of the Class II Railway Technical Office (BTP) in Padang, Hendrialdi, revealed that all railway tracks in West Sumatra, both active and inactive, are a priority for BTP Padang.

BTP PADANG INSTALLED STATE ASSET SIGNAGE ON THE SUNGAI LASI-SOLOK RAILWAY SECTION

Padang —  In an effort to secure state assets within its area of operation, the Padang Class II Railway Technical Office (BTP), through the Sawahlunto Service Unit (Satpel), has installed asset signage at several locations wher

RAIL THEFT SUSPECTS ARRESTED, BTP PADANG SEEKS TO INVESTIGATE THOROUGHLY

Padang — The Padang Panjang Police Criminal Investigation Department (Satreskrim) has arrested two suspects involved in the theft of railway tracks on the section between Batu Tabal and Kacang stations.

LEMBAH ANAI TRAIN DELAYED FOR UP TO 115 MINUTES DUE TO FLOODING

Padang — The recent heavy rains in West Sumatra caused flooding in several areas, including on KM 56+700/850 between Sicincin and Kayutanam.

RISING TOGETHER WITH REGIONAL GOVERNMENTS FOR THE DEVELOPMENT OF RAILWAYS IN WEST SUMATRA

Padang – The Railway Engineering Center Class II Padang (Balai Teknik Perkeretaapian Kelas II Padang), which operates under the Directorate General of Railways, Ministry of Transportation of the Republic of Indonesia, held a mee