BOGOR (09/03) - In preparation for the operation of the Bogor – Sukabumi double-track railway Bogor Paledang – Cicurug segment, the Railway Testing Center, together with the Directorate of Railway Infrastructure of the Directo
BOGOR - The construction of the Bogor - Sukabumi double track railway for the Bogor Paledang - Cicurug segment is currently approaching the stage of infrastructure testing and test commissioning for operating facilities.
Garut (2/3) – Menjelang peresmian pengoperasian jalur kereta api lintas Cibatu – Garut, Direktorat Keselamatan Perkeretaapian Ditjen Perkeretaapian (DJKA) Kementerian Perhubungan melakukan kegiatan Sosialisasi Perilaku Berkese
Bandung (5/2) – As a form of synergistic and collaborative synchronization efforts with various stakeholders in the railway sector, the Directorate General of Railways through the Railway Infrastructure Team and the Railway Deve