Operation of the State Property Ciremai SU 3 14 01 Measurement Train as Practice of Sharing Knowledge

Wednesday, April 6, 2022, the Ciremai Measurement Train has been operated with the facility identity number SU 3 14 01 in the context of sharing knowledge on the operation of measuring instruments on the Ciremai Measuring Train departing from Ngrombo Station - Brumbung Station (round trip).

            The purpose of this activity is to share knowledge in the operation and maintenance of measuring instruments on measuring trains assisted by related parties so that in the future, it can be operated by human resources owned by the Directorate General of Railways. This activity was attended by representatives from the Directorate of Railway Facilities, Railway Maintenance Center, Railway Testing Center, PT INKA (Persero), and PT INKA Multi Solusi Service (IMSS).

            The departure journey from Ngrombo Station - Brumbung Station (PP) starts at 10.40 WIB until 12.13 WIB. The implementation phase of the operation of the State-Owned Ciremai Measuring Train includes

  • preparing to turn on the measuring instrument control system,
  • reading the crossbar with a calculation result of 5mm,
  • comparing and equating the cross-level reading value on the monitor screen with the GEISMAR track gauge, and
  • preparing the input parameters in accordance with the manual measurement with a speed limit of 100 km/h.

            Overall, the journey and measurement process from Ngrombo Station - Brumbung Station (round trip) are safe, smooth, and controlled. So that there are no problems during the operation of the State-Owned Ciremai SU 3 14 01 Measurement Train. (DSP)

 

Share to:

Related Posts: