SOUTH SUMATRA RAILWAYS ENGINEERING OFFICE TO REVIEW ELECTRICITY WIRING OF MEDIUM-VOLTAGE OVERHEAD POWER LINES
(Muaraenim 5/5) – Railways Engineering Office Class II for South Sumatra Region has conducted a field survey in Emp. Merapi Station, Muaraenim-Lahat crossing Tuesday morning 4/5. Where this review is for the installation of the PLN Medium Voltage Air Line (SUTM) power cable that crosses the rails at KM. 415+300 Emp. Merapi Station by PT. Muara Alam Sejahtera.
The implementation of this review activity is carried out based on procedures and permits in accordance with applicable regulations. As for matters relating to or intersecting with the railway line, including the installation of the Medium Voltage Air Line (SUTM) power cable, further details are listed in the Minister of Transportation Regulation Number 36 of 2011 concerning Intersections and/or Intersections Between Railroads. Fire with Other Buildings. The direct field inspection was carried out by a team from the Railways Engineering Office Class II for the Southern Sumatra Region, who was represented by the infrastructure sector. It was also attended by contractors, consultants, and the Indonesian Railways Division III Palembang.
Komentar
LOGIN FOR COMMENT Sign in with Google