DJKA SPEED UP THE CONSTRUCTION OF KRIAN AND KEDINDING FLYOVER TO SUPPORT THE OPERATION OF MOJOKERTO-SEPANJANG DOUBLE LINE

Jakarta (20/01) - The Directorate General of Railways (DJKA) of the Ministry of Transportation through the Surabaya Railway Engineering Center (BTP) continues to work on the construction of the Krian and Kedinding Flyover so that

LEMBAH ANAI RAILBUS RELOCATED FROM BALAI YASA TO KAYUTANAM

Padang-Moments ago, the Railway Engineering Center (BTP) Class II Padang assisted in the transfer of the K3 2 11 01- K3 2 11 03 Railbus series or Lembah Anai Railbus from Balai Yasa Padang City to Kayutanam Station, Padang Pariama

CROSSING SAFETY BECOMES THE MAIN FOCUS OF BTP PADANG.

Padang-The increasing number of incidents at railway level crossings in West Sumatra (West Sumatera) has prompted Padang's Class II Railway Engineering Center (BTP) to prioritize safety.

THE PERCENTAGE OF FACILITY IMPROVEMENT AT PAUH LIMA STATION REACHED 100

Padang: Since 2023, Pauh Lima Station's facilities have been improved by the Class II Padang Railway Engineering Center. As of this now, 100% of the Pariaman Ekspres train Pauh Lima-Naras connection's station improvement process h

DJKA IS DEDICATED TO ENHANCING TRAIN TRAVEL SAFETY THROUGH THE EVALUATION OF RAILWAY INCIDENTS

Jakarta (15/01) - Risal Wasal, the Director General of Railways at the Ministry of Transportation, said that his team is still investigating the increasing number of train incidents that have been occurring recently. "We, together